Alabama Department of Environmental Management
(ADEM)
- Rosa Mine: One of top ten at SELC
- Environmental Groups call for EPA to take away state's authority over water permitting program
- ADEM Reform Coalition
- Conservation Alabama Releases Results of 'Citizen Evaluation of ADEM' (.pdf)
- Alabama and the Environmental Movement
- ADEM responds to citizens's comments
THE FOLLOWING ARE LINKS TO THE DIFFERENT PIECES OF THE MAY 2009 DRAFT OF THE
NPDES PERMIT NUMBER AL0080080
ALABAMA DEPARTMENT OF ENVIRONMENTAL MANAGEMENET (ADEM)
- INTRODUCTION
- Draft permit Issuance
- Receiving Bodies of Water for Sediment Ponds
- Table Of Contents
- PART 1 Discharge Limitations, Conditions, and Requirements
- discharge limitations
- Generally Applicable Discharge Limitations
- Post Mining Discharge Limitations
- Precipitation Event Discharge Limitations
- Monitoring And Reporting
- Sampling Schedule and Frequency
- Sampling Location
- Representative Sampling
- Test Procedures
- Recording Of Results
- Routine Inspection by Permittee
- Records Retention and Production
- Reporting
- Noncompliance Notification
- Reduction, Suspension or Termination of Monitoring and/or Reporting
- Permit Issued Based on Estimated Characteristics
- Schedule of Compliance
- Termination of Discharge
- PART 2 Other Requirements, Responsibilities and Duties
- Management Requirements
- Facilities Operation and Management
- Best Management Practices
- Duty to Mitigate
- Bypass
- Upset
- Removed Substances
- Loss or Failure of Treatment Facilities
- Prohibition Against Discharge from Facilities Not Certified
- Facility Identification
- Responsibilities
- Duty to Comply
- Change in Discharge
- Compliance with Toxic or Other Pollutant Effluent Standard or Prohibition
- Compliance with Water Quality Standards and Other Provisions
- Right of Entry and Inspection
- Updating Information
- Permit Modification, Suspension, Termination, Revocation and Automatic Expiration
- Duty to Provide Information
- Transfer of Permit
- Duty to Reapply
- Groundwater
- PART3 Other Permit Conditions
- Civil and Criminal Liability
- Tampering
- False Statements
- Permit Enforcement
- Relief from Liability
- Oil and Hazardous Substance Liability
- Property and Other Rights
- Availability of Reports
- Definitions
- Severability
- Prohibitions and Activities Not Authorized
- PART 4 Individual Permit Rationale
- Allowable TSS loads per Pond site (see legend)
- Pollutant Classifications
- PART 5 Permit Application
- Applicant Information
- Officer Information
- Legal Structure of Applicant
- Compliance History
- Proposed Schedule
- Other Permits/Authorizations
- Activity Description
- Proposed Activity To Be Conducted
- Material To Be Removed, Processed, Or Transloaded
- Fuel Handling
- Pollution Abatement and Prevention Plan
- Topographic Map Submittal
- Detailed Facility Map Submittal
- Proposed New Or Increased Discharges
- Alternatives Analysis
- Calculation Of Project Costs
- Receiving Waters
- Discharge Characterization
- Outfall Data
- Discharge Structure
- Information
- Pollution Abatement Plan
- Professional Engineer Certification
- Responsible Official Signature
- PART 6 Attachment 3, Landowners
- Spill Prevention Control and Countermeasures
- Schematic Diagram of Waste Cycle
