Alabama Department of Environmental Management
(ADEM)
News
- Southern Environmental Law Center appeals Rosa Mine Permit
- Environmental Groups call for EPA to take away state's authority over water permitting program
- ADEM Reform Coalition
- Conservation Alabama Releases Results of 'Citizen Evaluation of ADEM' (.pdf)
- Environmental Organizations present priorities to ADEM's new director
- Alabama and the Environmental Movement
- ADEM's response to citizens' concerns over the Rosa Coal Mine
THE FOLLOWING ARE LINKS TO THE DIFFERENT PIECES OF THE MAY 2009 DRAFT OF THE
NPDES PERMIT NUMBER AL0080080
(for Rosa Mine)
ALABAMA DEPARTMENT OF ENVIRONMENTAL MANAGEMENET (ADEM)
- INTRODUCTION
- Draft permit Issuance
- Receiving Bodies of Water for Sediment Ponds
- Table Of Contents
- PART 1 Discharge Limitations, Conditions, and Requirements
- discharge limitations
- Generally Applicable Discharge Limitations
- Post Mining Discharge Limitations
- Precipitation Event Discharge Limitations
- Monitoring And Reporting
- Sampling Schedule and Frequency
- Sampling Location
- Representative Sampling
- Test Procedures
- Recording Of Results
- Routine Inspection by Permittee
- Records Retention and Production
- Reporting
- Noncompliance Notification
- Reduction, Suspension or Termination of Monitoring and/or Reporting
- Permit Issued Based on Estimated Characteristics
- Schedule of Compliance
- Termination of Discharge
- PART 2 Other Requirements, Responsibilities and Duties
- Management Requirements
- Facilities Operation and Management
- Best Management Practices
- Duty to Mitigate
- Bypass
- Upset
- Removed Substances
- Loss or Failure of Treatment Facilities
- Prohibition Against Discharge from Facilities Not Certified
- Facility Identification
- Responsibilities
- Duty to Comply
- Change in Discharge
- Compliance with Toxic or Other Pollutant Effluent Standard or Prohibition
- Compliance with Water Quality Standards and Other Provisions
- Right of Entry and Inspection
- Updating Information
- Permit Modification, Suspension, Termination, Revocation and Automatic Expiration
- Duty to Provide Information
- Transfer of Permit
- Duty to Reapply
- Groundwater
- PART3 Other Permit Conditions
- Civil and Criminal Liability
- Tampering
- False Statements
- Permit Enforcement
- Relief from Liability
- Oil and Hazardous Substance Liability
- Property and Other Rights
- Availability of Reports
- Definitions
- Severability
- Prohibitions and Activities Not Authorized
- PART 4 Individual Permit Rationale
- Allowable TSS loads per Pond site (see legend)
- Pollutant Classifications
- PART 5 Permit Application
- Applicant Information
- Officer Information
- Legal Structure of Applicant
- Compliance History
- Proposed Schedule
- Other Permits/Authorizations
- Activity Description
- Proposed Activity To Be Conducted
- Material To Be Removed, Processed, Or Transloaded
- Fuel Handling
- Pollution Abatement and Prevention Plan
- Topographic Map Submittal
- Detailed Facility Map Submittal
- Proposed New Or Increased Discharges
- Alternatives Analysis
- Calculation Of Project Costs
- Receiving Waters
- Discharge Characterization
- Outfall Data
- Discharge Structure
- Information
- Pollution Abatement Plan
- Professional Engineer Certification
- Responsible Official Signature
- PART 6 Attachment 3, Landowners
- Spill Prevention Control and Countermeasures
- Schematic Diagram of Waste Cycle
