HOME
Rosamine
HOME
Friends of the Locust Fork River
MAPS
THE COAL COMPANY
MCoal/NovaDx
AUGER MINING
PERMITS
SELC
Southern Environmental Law Center
MEDIA ARCHIVE
ELECTED OFFICIALS
RESOURCES

MONITORING

Strip Mining Handbook
CONTACTS
DONATE
 

 

 

Alabama Department of Environmental Management (ADEM)

News

 

 

THE FOLLOWING ARE LINKS TO THE DIFFERENT PIECES OF THE MAY 2009 DRAFT OF THE

NPDES PERMIT NUMBER AL0080080

(for Rosa Mine)

ALABAMA DEPARTMENT OF ENVIRONMENTAL MANAGEMENET (ADEM)

 

  • INTRODUCTION
    • Draft permit Issuance
    • Receiving Bodies of Water for Sediment Ponds
    • Table Of Contents
  1. PART 1 Discharge Limitations, Conditions, and Requirements
    1. discharge limitations
      1. Generally Applicable Discharge Limitations
      2. Post Mining Discharge Limitations
      3. Precipitation Event Discharge Limitations
    2. Monitoring And Reporting
      1. Sampling Schedule and Frequency
      2. Sampling Location
      3. Representative Sampling
      4. Test Procedures
      5. Recording Of Results
      6. Routine Inspection by Permittee
      7. Records Retention and Production
      8. Reporting
      9. Noncompliance Notification
      10. Reduction, Suspension or Termination of Monitoring and/or Reporting
      11. Permit Issued Based on Estimated Characteristics
    3. Schedule of Compliance
    4. Termination of Discharge
  2. PART 2 Other Requirements, Responsibilities and Duties
    1. Management Requirements
      1. Facilities Operation and Management
      2. Best Management Practices
      3. Duty to Mitigate
      4. Bypass
      5. Upset
      6. Removed Substances
      7. Loss or Failure of Treatment Facilities
      8. Prohibition Against Discharge from Facilities Not Certified
      9. Facility Identification
    2. Responsibilities
      1. Duty to Comply
      2. Change in Discharge
      3. Compliance with Toxic or Other Pollutant Effluent Standard or Prohibition
      4. Compliance with Water Quality Standards and Other Provisions
      5. Right of Entry and Inspection
      6. Updating Information
      7. Permit Modification, Suspension, Termination, Revocation and Automatic Expiration
      8. Duty to Provide Information
      9. Transfer of Permit
      10. Duty to Reapply
      11. Groundwater
  3. PART3 Other Permit Conditions
    1. Civil and Criminal Liability
      1. Tampering
      2. False Statements
      3. Permit Enforcement
      4. Relief from Liability
    2. Oil and Hazardous Substance Liability
    3. Property and Other Rights
    4. Availability of Reports
    5. Definitions
    6. Severability
    7. Prohibitions and Activities Not Authorized
  4. PART 4 Individual Permit Rationale
    • Allowable TSS loads per Pond site (see legend)
    • Pollutant Classifications
  5. PART 5 Permit Application
    1. Applicant Information
    2. Officer Information
    3. Legal Structure of Applicant
    4. Compliance History
    5. Proposed Schedule
    6. Other Permits/Authorizations
    7. Activity Description
    8. Proposed Activity To Be Conducted
    9. Material To Be Removed, Processed, Or Transloaded
    10. Fuel Handling
    11. Pollution Abatement and Prevention Plan
    12. Topographic Map Submittal
    13. Detailed Facility Map Submittal
    14. Proposed New Or Increased Discharges
    15. Alternatives Analysis
    16. Calculation Of Project Costs
    17. Receiving Waters
    18. Discharge Characterization
    19. Outfall Data
    20. Discharge Structure
    21. Information
    22. Pollution Abatement Plan
    23. Professional Engineer Certification
    24. Responsible Official Signature
  6. PART 6 Attachment 3, Landowners
    • Spill Prevention Control and Countermeasures
    • Schematic Diagram of Waste Cycle